{"id":25923,"date":"2021-10-21T13:47:36","date_gmt":"2021-10-21T12:47:36","guid":{"rendered":"https:\/\/www.vergnet-hydro.com\/vh\/?p=25923"},"modified":"2021-10-21T14:20:39","modified_gmt":"2021-10-21T13:20:39","slug":"mali-solar-installations-drinking-water-10000-people-koulikoro-region","status":"publish","type":"post","link":"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/","title":{"rendered":"Mali: Solar installations to supply drinking water to 10,000 people in the Koulikoro region"},"content":{"rendered":"<p><em>Picture caption: Solar water supply system set up by the VERGNET HYDRO\/SEEBA team for a drinking water supply contract awarded by UNICEF in the regions of Koulikoro and Sikasso (Mali), in 2020.<\/em><\/p>\n<h2>The experience of the VERGNET HYDRO\/SEEBA team made the difference for this first contract with ENABEL in Mali<\/h2>\n<p>The <strong>Belgian development agency <a href=\"https:\/\/www.enabel.be\">ENABEL<\/a><\/strong> has just awarded a project to the consortium made up of <strong>VERGNET HYDRO<\/strong> and <a href=\"https:\/\/seeba-ml.com\"><strong>SEEBA<\/strong><\/a> (Bamako, Mali) for the <strong>installation and implementation of solar-powered water distribution facilities to supply drinking water to 10,000 people living in the Circle of Dioiala (Koulikoro region, Mali)<\/strong>. <em>\u201cWe\u2019re really proud to have signed our <strong>first contract with ENABEL in Mali<\/strong>. This first contract owes much to the <strong>experience of the VERGNET HYDRO\/SEEBA team<\/strong>, which has already installed\/renovated 36 community water distribution points in the regions of Koulikoro and Sikasso in 2020, and 27 community water distribution points in the region of Gao in 2019,\u201d<\/em> affirms <strong>Najib BENAZOUZ, Area Sales Manager for VERGNET HYDRO<\/strong>.<\/p>\n<p>This new market involves installing and implementing four drinking water supply networks (AEP) in the communes of Kemekafo, N\u2019Diondougou, Kaladougou and Banco. <em>\u201cThe equipment is comprised of <strong>four photovoltaic solar installations, with total power of over 32 kWc, four water towers with capacities of between 50 m3 and 90 m3, 42 community standpipes<\/strong>, four back-up generators, four chlorination systems and four solar lamps to secure the sites,\u201d<\/em> explains <strong>Roman SNRECH, Bids and Projects Officer at VERGNET HYDRO<\/strong>. VERGNET HYDRO will supply the equipment, while SEEBA will carry out the works.<\/p>\n<h3>A total budget of \u20ac1 million (656 million FCFA) funded by the Kingdom of Belgium<\/h3>\n<p>With a <strong>total budget of \u20ac1 million (656 million FCFA) funded by the Kingdom of Belgium and coordinated by ENABEL<\/strong>, this project is part of the <strong>2018-2023 Access to Drinking Water and Sanitation project in the Koulikoro region (PEPAK)<\/strong>, which aims to improve, in the long-term, access to drinking water and sanitation for people living in the town of Koulikoro and in rural and semi-urban centres in the region (\u20ac8 million, 5.25 billion FCFA).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Picture caption: Solar water supply system set up by the VERGNET HYDRO\/SEEBA team for a drinking water supply contract awarded by UNICEF in the regions&#8230;<\/p>\n","protected":false},"author":5,"featured_media":25911,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_vp_format_video_url":"","_vp_image_focal_point":[],"footnotes":""},"categories":[108,207,204,102,110],"tags":[],"class_list":["post-25923","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-drinking-water","category-mali-2","category-solar","category-uncategorized","category-water-supply-systems"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Mali: Solar installations to supply drinking water to 10,000 people in the Koulikoro region - Vergnet Hydro<\/title>\n<meta name=\"description\" content=\"The experience of the VERGNET HYDRO\/SEEBA team made the difference for this first contract with ENABEL in Mali. A total budget of \u20ac1 million (656 million FCFA) funded by the Kingdom of Belgium.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mali: Solar installations to supply drinking water to 10,000 people in the Koulikoro region - Vergnet Hydro\" \/>\n<meta property=\"og:description\" content=\"The experience of the VERGNET HYDRO\/SEEBA team made the difference for this first contract with ENABEL in Mali. A total budget of \u20ac1 million (656 million FCFA) funded by the Kingdom of Belgium.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/\" \/>\n<meta property=\"og:site_name\" content=\"Vergnet Hydro\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-21T12:47:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-10-21T13:20:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.vergnet-hydro.com\/vh\/wp-content\/uploads\/2021\/10\/PEPAK_mali-installations-solaires-eau-potable-10000-habitants-koulikoro1-mini.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"M.marteau\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"M.marteau\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/\",\"url\":\"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/\",\"name\":\"Mali: Solar installations to supply drinking water to 10,000 people in the Koulikoro region - Vergnet Hydro\",\"isPartOf\":{\"@id\":\"https:\/\/www.vergnet-hydro.com\/vh\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.vergnet-hydro.com\/vh\/wp-content\/uploads\/2021\/10\/PEPAK_mali-installations-solaires-eau-potable-10000-habitants-koulikoro1-mini.jpg\",\"datePublished\":\"2021-10-21T12:47:36+00:00\",\"dateModified\":\"2021-10-21T13:20:39+00:00\",\"author\":{\"@id\":\"https:\/\/www.vergnet-hydro.com\/vh\/#\/schema\/person\/196c7d08bf6187986c7e23a6765371b2\"},\"description\":\"The experience of the VERGNET HYDRO\/SEEBA team made the difference for this first contract with ENABEL in Mali. A total budget of \u20ac1 million (656 million FCFA) funded by the Kingdom of Belgium.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/#primaryimage\",\"url\":\"https:\/\/www.vergnet-hydro.com\/vh\/wp-content\/uploads\/2021\/10\/PEPAK_mali-installations-solaires-eau-potable-10000-habitants-koulikoro1-mini.jpg\",\"contentUrl\":\"https:\/\/www.vergnet-hydro.com\/vh\/wp-content\/uploads\/2021\/10\/PEPAK_mali-installations-solaires-eau-potable-10000-habitants-koulikoro1-mini.jpg\",\"width\":800,\"height\":600,\"caption\":\"PEPAK_mali-installations-solaires-eau-potable-10000-habitants-koulikoro1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/www.vergnet-hydro.com\/vh\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mali: Solar installations to supply drinking water to 10,000 people in the Koulikoro region\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.vergnet-hydro.com\/vh\/#website\",\"url\":\"https:\/\/www.vergnet-hydro.com\/vh\/\",\"name\":\"Vergnet Hydro\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.vergnet-hydro.com\/vh\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.vergnet-hydro.com\/vh\/#\/schema\/person\/196c7d08bf6187986c7e23a6765371b2\",\"name\":\"M.marteau\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.vergnet-hydro.com\/vh\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/424f3fb3dc05885f583957b2ef7057f7aa92df6d277b8d9d0ef555d747b7d58c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/424f3fb3dc05885f583957b2ef7057f7aa92df6d277b8d9d0ef555d747b7d58c?s=96&d=mm&r=g\",\"caption\":\"M.marteau\"},\"url\":\"https:\/\/www.vergnet-hydro.com\/vh\/en\/author\/m-marteau\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mali: Solar installations to supply drinking water to 10,000 people in the Koulikoro region - Vergnet Hydro","description":"The experience of the VERGNET HYDRO\/SEEBA team made the difference for this first contract with ENABEL in Mali. A total budget of \u20ac1 million (656 million FCFA) funded by the Kingdom of Belgium.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/","og_locale":"en_US","og_type":"article","og_title":"Mali: Solar installations to supply drinking water to 10,000 people in the Koulikoro region - Vergnet Hydro","og_description":"The experience of the VERGNET HYDRO\/SEEBA team made the difference for this first contract with ENABEL in Mali. A total budget of \u20ac1 million (656 million FCFA) funded by the Kingdom of Belgium.","og_url":"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/","og_site_name":"Vergnet Hydro","article_published_time":"2021-10-21T12:47:36+00:00","article_modified_time":"2021-10-21T13:20:39+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/www.vergnet-hydro.com\/vh\/wp-content\/uploads\/2021\/10\/PEPAK_mali-installations-solaires-eau-potable-10000-habitants-koulikoro1-mini.jpg","type":"image\/jpeg"}],"author":"M.marteau","twitter_card":"summary_large_image","twitter_misc":{"Written by":"M.marteau","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/","url":"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/","name":"Mali: Solar installations to supply drinking water to 10,000 people in the Koulikoro region - Vergnet Hydro","isPartOf":{"@id":"https:\/\/www.vergnet-hydro.com\/vh\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/#primaryimage"},"image":{"@id":"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/#primaryimage"},"thumbnailUrl":"https:\/\/www.vergnet-hydro.com\/vh\/wp-content\/uploads\/2021\/10\/PEPAK_mali-installations-solaires-eau-potable-10000-habitants-koulikoro1-mini.jpg","datePublished":"2021-10-21T12:47:36+00:00","dateModified":"2021-10-21T13:20:39+00:00","author":{"@id":"https:\/\/www.vergnet-hydro.com\/vh\/#\/schema\/person\/196c7d08bf6187986c7e23a6765371b2"},"description":"The experience of the VERGNET HYDRO\/SEEBA team made the difference for this first contract with ENABEL in Mali. A total budget of \u20ac1 million (656 million FCFA) funded by the Kingdom of Belgium.","breadcrumb":{"@id":"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/#primaryimage","url":"https:\/\/www.vergnet-hydro.com\/vh\/wp-content\/uploads\/2021\/10\/PEPAK_mali-installations-solaires-eau-potable-10000-habitants-koulikoro1-mini.jpg","contentUrl":"https:\/\/www.vergnet-hydro.com\/vh\/wp-content\/uploads\/2021\/10\/PEPAK_mali-installations-solaires-eau-potable-10000-habitants-koulikoro1-mini.jpg","width":800,"height":600,"caption":"PEPAK_mali-installations-solaires-eau-potable-10000-habitants-koulikoro1"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vergnet-hydro.com\/vh\/en\/mali-solar-installations-drinking-water-10000-people-koulikoro-region\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.vergnet-hydro.com\/vh\/en\/"},{"@type":"ListItem","position":2,"name":"Mali: Solar installations to supply drinking water to 10,000 people in the Koulikoro region"}]},{"@type":"WebSite","@id":"https:\/\/www.vergnet-hydro.com\/vh\/#website","url":"https:\/\/www.vergnet-hydro.com\/vh\/","name":"Vergnet Hydro","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.vergnet-hydro.com\/vh\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.vergnet-hydro.com\/vh\/#\/schema\/person\/196c7d08bf6187986c7e23a6765371b2","name":"M.marteau","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vergnet-hydro.com\/vh\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/424f3fb3dc05885f583957b2ef7057f7aa92df6d277b8d9d0ef555d747b7d58c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/424f3fb3dc05885f583957b2ef7057f7aa92df6d277b8d9d0ef555d747b7d58c?s=96&d=mm&r=g","caption":"M.marteau"},"url":"https:\/\/www.vergnet-hydro.com\/vh\/en\/author\/m-marteau\/"}]}},"_links":{"self":[{"href":"https:\/\/www.vergnet-hydro.com\/vh\/en\/wp-json\/wp\/v2\/posts\/25923","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vergnet-hydro.com\/vh\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vergnet-hydro.com\/vh\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vergnet-hydro.com\/vh\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vergnet-hydro.com\/vh\/en\/wp-json\/wp\/v2\/comments?post=25923"}],"version-history":[{"count":6,"href":"https:\/\/www.vergnet-hydro.com\/vh\/en\/wp-json\/wp\/v2\/posts\/25923\/revisions"}],"predecessor-version":[{"id":25929,"href":"https:\/\/www.vergnet-hydro.com\/vh\/en\/wp-json\/wp\/v2\/posts\/25923\/revisions\/25929"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vergnet-hydro.com\/vh\/en\/wp-json\/wp\/v2\/media\/25911"}],"wp:attachment":[{"href":"https:\/\/www.vergnet-hydro.com\/vh\/en\/wp-json\/wp\/v2\/media?parent=25923"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vergnet-hydro.com\/vh\/en\/wp-json\/wp\/v2\/categories?post=25923"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vergnet-hydro.com\/vh\/en\/wp-json\/wp\/v2\/tags?post=25923"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}